GETTING TO WORK.

As far as the cabin goes, the easy stuff is over. We have a frame, but now it needs insulation, siding, electrical work, a stove pipe, etc., etc., etc.. So this weekend, I made my trip to the hardware store, picked up a ton of supplies and got to work.The first step was installing the wiring for electricity, which I admit is a bit hilarious considering how far off we are from actually getting (solar) electricity. But, if you ever want electricity in your house, you gotta do it before you insulate. Eric and Cher from Bugtussle Farm––who were incredibly generous with their time and knowledge for me this weekend––said they had their sockets empty for TEN YEARS before they got electricity. When they were ready, though, they just plugged it in and turned it on (more or less). So we did a lot of electrical work and a lot of insulating. Nearly 4,000 staples later, we were finished with insulating the floor and almost two whole walls. All in all, if one can base success on soreness, it was a very successful weekend.- Jesse.electric mess staple gun floor insulation kitchen insulation sawdust jesse

Previous
Previous

HARDWARE STORY.

Next
Next

THANK YOU, DR. KING.